DATE OF DELIVERYJULY 2014
BUILDING OPENING DATEOCTOBER 2014
CONSTRUCTION SITE100.000 m²
GROSS FLOOR AREA930 - 1096 m²
NET FLOOR AREA631 - 800 m²
HEATING - COOLING SYSTEMHeating with natural gas-fired boilers for offices and common areas, the cooling system with water-cooled chillers will be made in the central system. Using 4-pipe fan coil units for heating and cooling systems in public areas will be realized. For heating and cooling installations of Office will be left ready and suitable for installation 4-pipe fan-coil systems infrastructure. Heating and cooling costs for each individual department will be measured by calorimetry. Shops - grocery - cafe areas for VRF infrastructure will be prepared.
NO. OF LIFTS8 PASSENGERS + 1 LOAD + 3 CAR PARKS
NO. OF CLOSED CAR PARKS1012
NO. OF CAR PARKS PER FLOOR15 -18
ENVIRONMENTAL AWARENESSGOLD LEED CERTIFICATE
CONSTRUCTIONThe tools using in implementation will be proper to Turkish Manufacturing Standarts, Prosperity Specifications, and national norms.
FRONT SPIECECutain Wall Sytem will be used for exterior.There are high heat and sound insulation features in exterior.The wind simulation test was made according to exterior design.
WALLThere are gas concrete and gypsum board that lead to sound isolation between independent walls.Wet in 1st class ceramic tiles will be made available in public areas. There are gas concrete and gypsum board that don’t reach to ceiling in store walls. There are gas concrete and gypsum board in communal areas.
WALL COATINGSThe floor of independent areas will be reinforced concrete that suitable for false floor. The false floor will completed by owner or tenant. There will be fieldstone covering in communal areas and floors. Fieldstone, ceramic, carpet, wood etc. will be used social parts of communal areas. All of the services and fire escape corridors will be paint covered concrete.
WALL COATINGSIndependent chapter walls will be delivered as made of aerated concrete or plaster over drywall. In all elevator halls will be used natural stone cladding. Common architecture in the social area materials will be used in the project in accordance with the wood, natural stone, wall paper, plaster painting, etc... All service and fire escape corridorpaint will be applied by concrete.
DOORSIndependent section gates’ doors will be temporarily completed as aluminum. Then, the doors which are suitable for the interior decoration will be made by the owner or tenant. Fire-resistantance certified steel doors with panic push bar will be installed in areas where fire regulations require. Tower revolving glass door entrance to the project and appropriate standards will be found. Steel or aluminum casing wood veneer doors that suitable for architectural projects will be made in the public areas. Wet doors will be compact laminate door. Warehouse doors will be steel framed with steel or aluminum doors.
CEILSThe ceilings in independent areas will be concrete. Plasterboard suspended ceiling will be produced in communal areas. All wet areas of commonunal areas plasterboard suspended ceiling or ceiling material based on design parameters. Parking ceilings, concrete fire escape and service corridors will be delivered as concrete ceilings painted with plastic paint.
WET AREASFirst quality water-saving fixtures that are appropriate to Leed Criteria will be used. Production of compact laminate partitions will be carried out in wet areas. 1st class ceramic tiles will be made on the floor according to the Project.